- Scope of work also: SOW, statement of work, work scope
- A scope of work is the written, itemised description of exactly what a contractor will do on a job — the tasks, the materials, the quantities and the conditions. It is what a price is a price for.
- Bid leveling also: bid levelling, levelling bids, bid analysis
- Bid leveling is the process of adjusting competing contractor bids onto a common basis so their prices can be compared directly — adding in what one bidder excluded, stripping out what another included, until every number covers the same work.
- Exclusion also: exclusions, excluded work, not included
- An exclusion is work a contractor has explicitly stated their price does not cover. Exclusions are a legitimate and normal part of a bid — the danger is not that they exist, but that they are easy to miss.
- Change order also: change orders, variation order, extra work order
- A change order is a written amendment to a signed contract that adds, removes or alters work, and adjusts the price and schedule accordingly. It is the mechanism by which a job's final cost stops matching the bid you accepted.
- Allowance also: allowances, cash allowance, provisional sum
- An allowance is a placeholder amount included in a bid for work or materials that have not been specified yet — a budget line to be reconciled against the actual cost once the choice is made.
- Apples-to-apples comparison also: like-for-like comparison, comparable quotes, comparable bids
- An apples-to-apples comparison is one where every bid covers identical work under identical conditions, so the only variable left between them is price. Achieving it requires a single shared scope; without one, the phrase is aspirational.
- Three-bid rule also: rule of three bids, three quotes, competitive bidding
- The three-bid rule is the common practice — and, for many property managers and HOA boards, a written policy — of collecting at least three competing bids before awarding work above a certain value.
- Unit price also: unit pricing, unit rate
- A unit price is a per-unit rate — per square foot, per linear foot, per sheet, per fixture — agreed in advance so that work of unknown quantity can be priced without renegotiation.
- Lump-sum bid also: fixed price, stipulated sum, fixed-price contract
- A lump-sum bid is a single fixed price for the entire defined scope, regardless of what the work actually costs the contractor to perform. The contractor carries the risk of their own estimate being wrong.
- General conditions also: general requirements, project overhead
- General conditions are the costs of running a job that are not part of any single task — supervision, dumpsters, portable toilets, temporary protection, permits, site cleanup, insurance and mobilisation.
- Mobilization also: mobilisation, mobilization fee, setup cost
- Mobilization is the cost and effort of getting a crew, equipment and materials to a site and set up to work — and, at the end, of demobilising and restoring the site.
- Punch list also: snag list, punchlist, completion list
- A punch list is the itemised list of incomplete or defective work identified near the end of a job, which the contractor must finish before the work is accepted and final payment released.
- Retainage also: retention, holdback
- Retainage is a percentage of each payment — commonly 5–10% — withheld until the job is complete and accepted, held as security that the contractor will return to finish the last items.
Glossary
The words on a contractor bid, defined
Most of the money in a bid comparison hides inside four or five terms. These are the ones worth knowing before you sign anything.